| |
Current Projects |
|
|
| |
|
Sitetech has been involved with numerous construction projects both large and small. Our clients include many of the finest contractors, property owners and developers in our market and we strive to always offer the highest level of professionalism and quality available. |
|
| |
|
|
|
| |




|
Norwalk Raceway Park |
|
| |
|
|
| |
This project was completed in the race tracks off season, (February thru April), under very challenging weather conditions and was completed on time.
Export, place and compact offsite over 59,000 CY of soil.
Installation and fine grading of 67,000 Tons of aggregate base material for the asphalt pavement.
Installation of 2,100 LF of storm sewer.
Installation of 12,700 LF of sanitary sewer, most of which was in 5000 psi sandstone and high ground water.
Finish grading and seeding of the entire project. |
|
| |
|
|
| |
|
|
|
| |
|
Skill Metal Products |
|
| |
|
|
|
| |
|
Cut and fill of 6,700 CY of onsite soil.
Installation of 2,300 Tons of aggregate base material for concrete paving. |
|
| |
|
|
|
|